Technical assessment
MCM reviews the product, defect type, required tests, cycle time, operator workflow and integration constraints.
MCM projects start with your product, your defect and your line constraints. The goal is to reduce risk before engineering, build a practical system and keep support close after commissioning.
MCM reviews the product, defect type, required tests, cycle time, operator workflow and integration constraints.
Real samples are used to validate detection, measurement, test sequence or traceability approach before the project is locked.
The team defines cameras, lighting, sensors, mechanics, electrical cabinets, fixtures, software and safety requirements.
The system is assembled and tested with your products to confirm pass/fail logic, repeatability and operator use.
MCM installs the workstation on the line, connects PLC/MES/traceability when needed and supports operator training.
After installation, the team stays close for adjustments, troubleshooting, software improvements and production follow-up.
The better the initial information, the faster MCM can define the right technical route and avoid unnecessary complexity.
MCM will recommend whether the project should move to a feasibility test, pilot, quotation, meeting or technical demo.