Questions manufacturers ask before starting a project.

Clear answers about feasibility, customisation, integration, commissioning and long-term support.

Will the system work reliably with our specific products and production line?

That is the first question we try to answer. MCM starts from the real product, defect, cycle time and line constraints. Where uncertainty exists, a feasibility test or pilot can be used before the full system is engineered.

Can MCM customise the solution to our process?

Yes. Most projects are engineered around the customer process rather than selected from a fixed catalogue. Cameras, lighting, mechanics, test interfaces, software, reject logic and traceability can be adapted to the application.

Can you integrate with an existing production line?

In many projects the new system must communicate with existing PLCs, machines, databases or factory networks. Integration requirements are reviewed during the technical assessment so that interfaces and responsibilities are clear before build.

What happens after installation and commissioning?

Support can include remote diagnostics, on-site intervention, software changes, operator guidance, maintenance planning and replacement of relevant components. The exact support model depends on the installed system and customer needs.

Do you support traceability and production data?

Yes. Depending on the application, the system can record inspection or test results, serial numbers, timestamps, recipes and other production data. The architecture is defined around the customer traceability requirements.

When is 3D vision better than 2D vision?

3D vision is useful when height, depth, volume, profile or deformation carries the decision. 2D vision is often more efficient for presence, orientation, print, colour, surface and dimensional checks that can be resolved from image contrast.

When should deep learning be considered?

Deep learning can be useful when defect appearance varies too much for stable rule-based inspection. It still requires representative data and a realistic validation plan, so it is selected when it adds practical value rather than simply because it is fashionable.

How long does a custom project take?

Project duration depends on scope, mechanical complexity, purchased components, validation requirements and site coordination. A typical custom system may take several months, with milestones agreed during proposal and project planning.